Mary kay
Carmel,#2Author of original report
Mon, June 25, 2007
The structural cracks were injected and re-plastered. The pool was opened on 5/16/07. In short, Blue Haven of Indianapolis did honor the warranty, but took excessive time in doing so. The pool is holding water and operating normally.